RUBBLIZING
“DerzhdorNDI” SE specialists perform scientific and technical support of modern technologies on the road H-32 Pokrovsk - Bakhmut - Mykhailivka, km 16 + 800 - km 31 + 000.
Rubblizing of cement-concrete pavement with the use of modern American equipment is performed here.
The technology involves use of recycled cement concrete as the foundation of road pavement, which saves significant volumes of material and technical resources and significantly reduces traffic intensity.
Actually, more than 60% of cement-concrete pavement rubblizing works have been completed, and the arrangement of the pavement upper layers has begun.
Specialists of the Institute recommended the optimal design of pavement, in accordance with the requirements of modern GBN B.2.3-37641918-559: 2019 "Roads. Non-rigid pavements. Designing".
Archive
- 2025
- 2024
- 2023
- 2022
- 2021
- 2020
- 2019
- 2018