SECTION 5
The pace of implementation of the "Big Construction" program does not slow down.
Yesterday with use of modern means of communication, the meeting of Section 5 "Design of Highways and Bridges" in online mode took place.
In the course of the meeting, the design solutions for facilities of current midterm repair of Dnipropetrovsk and Mykolaiv regions were considered.
Traditionally, the members of the section paid special attention to the issues concerning:
road pavement design options;
options for repair of artificial structures;
variants of road traffic management schemes;
variants of logistic schemes of transportation of road-building materials;
cost parameters of the facility.
Our goal is the maximum accounting of the latest developments by designers in regulatory documents providing for the introduction of modern materials and technologies.
In particular, on the section of the road P-73 / H-08 / - Nikopol it is planned to use industrial waste (metallurgical slags), which is a practical implementation of the resolution of Cabinet of Ministers of Ukraine "On the use of industrial waste in road construction" as of 04.12.19 № 1420-r.
We continue fruitful cooperation with Road services in the regions to ensure quality performance of repair and construction works on public roads.
Archive
- 2024
- 2023
- 2022
- 2021
- 2020
- 2019
- 2018