UPDATES TO THE SOFTWARE COMPLEX "CONSTRUCTION TECHNOLOGIES - ESTIMATES"
The updates to the software complex for determining the road works costs "Construction Technologies - Estimates" (Version 7.9.47 dated 25.09.2019) had been issued.
Download the update here
Version 7.9.47 includes following:
1. In this update, the exchange of estimates documentation with the software "Construction Technologies: Estimates 8" had been improved.
2. Now you can upload archives into the software "Construction Technologies: Estimates 8" from the software "Construction Technologies: Estimates 7", including folders containing estimates without using of special commands.
3. The regulatory framework of estimates is supplemented by following SOU:
SOU Б Д.2.2-13617440-001: 2012 «Resource elemental estimates norms for construction works. Airfields» with amendments No. 1, 2, 3, 4.
SOU Д. 2.4-32794511-001: 2017 «Resource elemental estimates norms for construction works. Airfields»
SOU Б Д.2.2-13617440-005: 2012 «Resource elemental estimates norms for construction works. Pile works».
SOU Д.2.2-32794511-009: 2011 «Resource elemental estimates norms for construction works. Highways and airfields»
SOU Д.2.4-39620512-001: 2017 «Resource elemental estimates norms for repair and construction works. Stump removal by chopping»
SOU Д.2.7-39620512-002: 2017 «Resource estimates norms for the construction machines and mechanisms operating conditions. The stump chopper FSI B22, capacity 10,5 kW».
SOU Д.2.4-39620512-002: 2018 «Resource elemental estimates norms for repair and construction works. Cutting trees branches and trunks in city conditions, timber chopping»
SOU Д.2.7-39620512-003: 2018 «Resource estimates norms for the construction machines and mechanisms operating conditions. Chopper machine DP 660 TC»
SOU Д.2.4-03358222-001: 2018 «Resource elemental estimates norms for repair and construction works. Asphalt pavements circular cutting»
SOU Д.2.7-03358222-001: 2018 «Resource estimates of operation of construction machines and mechanisms. Mounted cutter on the basis of the JCB 3CX SM shovel-loader for asphalt pavement circular cutting».
SOU Д.2.4-40438660-001: 2019 «Resource elemental estimates for construction works. Recovering of pipelines with flexible polymer sleeves».
SOU Д.2.2-40781863-001: 2019 «Resource elemental estimates for construction works. Soils reinforcement and consolidation using of SPT technology»
SOU Д.2.2-40781863-002: 2019 «Resource elemental estimates for construction works. Waterproofing and sealing of structures, filling of voids by structures, block, inter-block and control injection in tunnels construction using of SPT technology»
SOU Д.2.2-33053410-001: 2018 «Resource elemental estimates for construction works. Concrete structures reinforcement by materials with carbon fibers of Sika TM».
SOU Д.2.4-01190043-001: 2013 «Resource elemental estimates for repair and construction works. Adjustment of efforts in constant stretching of steel radio-television masts»
For ordering and installation of software complex «Construction Technologies: Estimates 8» please contact by phone (044) 201-08-47 or E-mail: mcdm@ukr.net
Archive
- 2025
- 2024
- 2023
- 2022
- 2021
- 2020
- 2019
- 2018