INSPECTION OF BRIDGES
“DerzhdorNDI” SE specialists performed the inspection of five bridges and one overpass in Cherkasy region.
In particular, the following artificial road structures were inspected:
• M-12 Stryi- Ternopil - Kropyvnytskyi - Znamianka (via Vinnytsia);
• H-16 Zolotonosha- Cherkasy- Smila- Uman;
• Р-10 / Р-09 / Cherkasy- Chyhyryn- Kremenchuk;
• T-24-03 Oradivka- Khrystynivka- Zhashkiv- Korsun’ Shevchenkivskyi- Moshny;
• T-24-16 / M-12 / -Sushkivka- Vilshana- Slobidka Rohova- Perehonivka.
During the inspection the following was performed:
• instrumental imaging inspection of bridges;
• measurement of geometric parameters;
• listing of defects;
• determination of concrete strength of bridge elements;
• inspection of the approaches to bridges.
“DerzhdorNDI” SE Bridge Management Department performs the following works:
• inspection of structures,
• testing of structures,
• certification of structures,
• scientific support of designing and performing of works,
• filling the AESUM database.
For more information please contact Larysa Bodnar, PhD. , Head of Bridge Management Department.
tel. +38 044 206 98 82, e-mail: laragor@ukr.net
Archive
- 2025
- 2024
- 2023
- 2022
- 2021
- 2020
- 2019
- 2018