INFORMATION OF MINISTRY OF REGIONAL DEVELOPMENT
Ministry of Regional Development of Ukraine has published information regarding use of the Rules for construction cost determination (DSTU B D.1.1-1: 2013), the Rules for determination of designing and engineering works and examination of design documentation for construction (DSTU B D.1.1-7: 2013) and resource element estimates for the relevant types of construction works (DSTU) during determination of construction cost, the cost of designing, research and development, engineering works and examination of design documentation for construction in the transition period until the approval of new Pricing Procedures.
Detail information – by the link:
https://www.minregion.gov.ua/napryamki-diyalnosti/building/pricing/tsinoutvorennya/pro-vyznachennya-vartosti-budivnycztva-ta-vartosti-proektno-vyshukuvalnyh-robit-ta-ekspertyzy-proektnoyi-dokumentacziyi-na-budivnycztvo/?fbclid=IwAR17pNPUVs3lVB6vi4Ae7-BuHT0LY4j3C7Cx0OGcn-DVid5jHE8QYOOUO7I%20(https://www.minregion.gov.ua/napryamki-diyalnosti/building/pricing/tsinoutvorennya/pro-vyznachennya-vartosti-budivnycztva-ta-vartosti-proektno-vyshukuvalnyh-robit-ta-ekspertyzy-proektnoyi-dokumentacziyi-na-budivnycztvo/?fbclid=IwAR17pNPUVs3lVB6vi4Ae7-BuHT0LY4j3C7Cx0OGcn-DVid5jHE8QYOOUO7I)
Archive
- 2025
- 2024
- 2023
- 2022
- 2021
- 2020
- 2019
- 2018